We collaborated with RTE on the Prinquiau PSEM substation for the realization of the underground combing plans and the supply of the material.

 

The stages of the project :

  • 3D modelling of the building (measurements on site)
  • Study of the routing and fixing systems (10 LS)
  • Realization of the plans of establishment
  • Material estimate for all components (clamps, structures)
  • Assembly plan of the different assemblies (ladder, trestles, gangways)
  • Supply of the material

 

Do not hesitate to contact us for a possible request and to consult our Catalogue Cleats and Accessories available on our website:

commercial@alroc.fr

https://www.alroc.fr/documentations/