
Supply of a Source Station

We collaborated with RTE on the Prinquiau PSEM substation for the realization of the underground combing plans and the supply of the material.
The stages of the project :
- 3D modelling of the building (measurements on site)
- Study of the routing and fixing systems (10 LS)
- Realization of the plans of establishment
- Material estimate for all components (clamps, structures)
- Assembly plan of the different assemblies (ladder, trestles, gangways)
- Supply of the material
Do not hesitate to contact us for a possible request and to consult our Catalogue Cleats and Accessories available on our website: